City of Atlanta
Georgia

Resolution
16-R-3951
Adopted Substitute
Jul 18, 2016 1:00 PM

SUBSTITUTED BY CITY UTILITIES COMMITTEE
A RESOLUTION BY COUNCILMEMEBR IVORY LEE YOUNG JR., SUBSTITUTED BY CITY UTILITIES COMMITTEE
AND SUBSTITUTED BY THE ATLANTA CITY COUNCIL
A RESOLUTION AUTHORIZING THE MAYOR, OR HIS DESIGNEE, ON BEHALF
OF THE CITY OF ATLANTA, TO EXECUTE A CONTRACT WITH SUNBELT
STRUCTURES DBA GEORGIA BRIDGE AND CONCRETE AND SD&C, INC., FOR
FC-8430, TO DESIGN AND CONSTRUCT A PEDESTRIAN BRIDGE
APPROXIMATELY FIFTEEN (15) FEET WIDE BY ONE HUNDRED TEN (110) FEET
LONG CROSSING OVER NORTHSIDE DRIVE, ON BEHALF OF THE
DEPARTMENT OF PUBLIC WORKS, IN AN AMOUNT NOT TO EXCEED TWELVE
MILLION EIGHT HUNDRED NINETY THOUSAND TWO HUNDRED FIFTY FOUR
DOLLARS AND NO CENTS ($12,890,254.00); ALL CONTRACTED WORK TO BE
CHARGED TO AND PAID FROM VARlOUS FUND, DEPARTMENT,
ORGANIZATION AND ACCOUNT NUMBERS LISTED HEREIN; AND FOR OTHER
PURPOSES.

Information

Department:Office of the Municipal ClerkSponsors:Councilmember, District 3 Ivory Lee Young Jr.
Category:Personal PaperFunctions:None Required

Attachments

  1. Printout
  2. 21 FC-8430
  3. SUB 16-R-3951 (Sunbelt JV for Northside Dr Bridge) (This file has not yet been converted to a viewable format)
  4. 16-R-3951 (Sunbelt JV for Northside Dr Bridge - DOP Summary) (This file has not yet been converted to a viewable format)
  5. 16-R-3951(Condition Form) (This file has not yet been converted to a viewable format)
  6. 16R3951 SUBSTITUTE
  7. 16r3951

Body

WHEREAS, the City of Atlanta ("City") held over fifty (50) neighborhood meetings in the Vine

City neighborhood; and

 

WHEREAS, during those neighborhood meetings, the residents expressed a need for greater connectivity to Downtown Atlanta; and

,.

WHEREAS, as a result of these meetings, Mayor Reed's administration agreed to provide the connectivity to Downtown Atlanta by using a series of transportation means, including a pedestrian bridge beginning at the Vine City MART A Station and crossing Northside . Drive providing a safe and effective pedestrian crossing route that will not encounter the numerous conflict points along Northside Drive; and

 

WHEREAS, the City is in need of design and construction services for the pedestrian bridge connecting the parking lot of the Vine City MARTA Station across Northside Drive and into the

Downtown Atlanta area; and

 

WHEREAS, the City did solicit Bids for Contract Number FC-8430, Design Build Northside

Drive Pedestrian Bridge ("Contract"); and

 

WHEREAS, after reviewing and evaluating the Bids, the Commissioner of the Department of Public Works and the Chief Procurement Officer recommend that the Contract be awarded to Sunbelt Structures d/b/a Georgia Bridge and Concrete and SD&C, Inc., as a joint venture, in an amount not to exceed Twelve Million Eight Hundred Ninety Thousand Two Hundred Fifty Four Dollars and No Cents ($12,890,254.00); and of

 

WHEREAS, the term of the Contract shall be for four hundred twenty (420) days from execution.

 

THE CITY COUNCIL OF THE CITY OF ATLANTA, GEORGIA HEREBY RESOLVES, that the Mayor, or his designee, is authorized to execute Contract Number FC- 8340, Design Build Northside Drive Pedestrian Bridge with Sunbelt Structures dba Georgia Bridge and Concrete and SD&C, Inc., in an amount not to exceed Twelve Million Eight Hundred

Ninety Thousand Two Hundred Fifty Four Dollars and No Cents ($12,890,254.00).

 

BE IT FURTHER RESOLVED, that the City has identified several funding sources for the Project and that the City's Chief Financial Officer, in his sole discretion, is hereby authorized to charge to and pay for work under the Contract in the amount of 12,890,254.00 from the following accounts: Intergovernmental Grant Fund.DPW Transportation Design.Projects And Grants Budget. Traffic Engineering.NS Street Bridge. GDOT Bridge account numbers: 2501.130308.5999999.4270000.112536.32350 in an amount up to Two Million Dollars ($2,000,000.00) and/or 2015 Infrastructure Bond DPW Transportation Design Projects and Grants Budget.Traffic Engineering.Transportation Infrastructure.Infrastructure Bond-DPW account numbers: 3147.130308.5999999.4270000.112184.22280 in an amount up to Six Million

Eight Hundred Ninety Thousand Two Hundred Fifty Four Dollars ($6,890,254.00) and/or General Fund.DPW Roadways & Walkways Consulting I Professional.Emergency Management

account numbers: 1001.130306.5212001.4220000 in an amount up to Four Million Dollars ($4,000,000.00)

 

BE IT FURTHER RESOLVED, that the Chief Procurement Officer is directed to assist the City Attorney in the preparation of the appropriate Contract for execution by the Mayor, or his designee.

 

BE IT FINALLY RESOLVED, that the Contract will not become binding upon the City, and the City will incur no liability under it until the Contract has been approved by the City Attorney as to form, executed by the Mayor, attested to by the Municipal Clerk, and delivered to with Sunbelt Structures dba Georgia Bridge and Concrete and SD&C, Inc.

 

Meeting History

Jul 5, 2016 1:00 PM Video Atlanta City Council Regular Meeting
draft Draft

REFERRED TO CITY UTILITIES COMMITTEE WITHOUT OBJECTION

RESULT:REFERRED WITHOUT OBJECTION
Jul 12, 2016 9:30 AM Video City Utilities Committee Regular Committee Meeting
draft Draft
RESULT:FAVORABLE/SUB/CONDITION [4 TO 0]
AYES:Natalyn Mosby Archibong, Clarence "C. T." Martin, Andre Dickens, Joyce M Sheperd
ABSTAIN:Howard Shook, Alex Wan
AWAY:Yolanda Adrean
Jul 18, 2016 1:00 PM Video Atlanta City Council Regular Meeting
draft Draft

ADOPTED SUBSTITUTE BY A ROLL CALL VOTE OF 12 YEAS; 1 NAY

RESULT:ADOPTED SUBSTITUTE [12 TO 1]
AYES:Michael Julian Bond, Mary Norwood, Andre Dickens, Carla Smith, Kwanza Hall, Ivory Lee Young Jr., Cleta Winslow, Natalyn Mosby Archibong, Howard Shook, Yolanda Adrean, Clarence "C. T." Martin, Joyce M Sheperd
NAYS:Felicia A Moore
ABSENT:Keisha Lance Bottoms
AWAY:Alex Wan